Loadfactor

Loadfactor / Site energy

Commercial electricity, gas, solar and EV charging

Get a commercial site's electricity, gas, solar or EV charging priced: the load, utility territory and term set out the way suppliers and installers quote.

Specify

Fill in the site and load below and send them.

01What you need
02Specification
03Quantity, place and timing
04If you want a reply

What it is for

A business site pays for energy through a utility tariff or a supply contract and may want to change that: a fixed-price electricity or gas contract at renewal, on-site solar to cut daytime cost, or chargers for a fleet or customers. What is available depends on annual usage, peak demand, utility territory and the term the business will commit to. Set out the site, the load, the utility territory and the term the way a supplier or installer needs to see them.

Who uses it

Facility and operations managers, finance staff renewing an energy contract, fleet managers electrifying vehicles, property owners adding chargers or solar, and agents acting for them.

What you get

A reference number, a brief of the site's energy requirement (load, utility territory, contract or project type and term) suppliers and installers can price, and a reply when we can point you to one.

Who runs it, and what it costs

Loadfactor. Operated by Tempered Technologies LLC, 8 The Green STE B, Dover, DE 19901. Privacy questions and deletion requests: privacy@forevenza.com. Privacy notice.

Sending a requirement is free.

Scope

United States; other markets are recorded as stated.

  • Usage, demand and tariff figures are recorded as you state them; no bill is read or audited.

Sources

For developers and agents

Send the same requirement as JSON to POST /commercial-energy/requests (schema: /commercial-energy/schema.json), or call the submit_request tool on the MCP endpoint at https://loadfactor.forevenza.com/mcp. This page as Markdown: index.md.

{
  "action": "quote",
  "need": "Fixed-price electricity supply for a 120,000 square foot cold-storage warehouse in the Oncor territory in Texas, from when the current contract ends in March 2027, on a 36-month term.",
  "specifications": {
    "need_type": "ELECTRICITY_SUPPLY",
    "utility_territory": "Oncor (ERCOT), Texas",
    "annual_kwh": 4200000,
    "peak_demand_kw": 900,
    "contract_term_months": 36,
    "start_date": "2027-03-15"
  },
  "quantity": {
    "amount": 4200000,
    "unit": "kWh",
    "per": "year"
  },
  "timing": {
    "earliest": "2027-03-15"
  },
  "geography": {
    "text": "Dallas-Fort Worth, TX",
    "country": "US"
  },
  "budget": {
    "amount": 0.085,
    "currency": "USD",
    "per": "unit"
  }
}